单选题 which contract type consists of - target costs & profit, ceiling prices and shared ratio of risk? 查看答案
单选题 methods and techniques used to examine cost and technical data are called feasibility studies. the economic aspects of a feasibility study
include interest rates, present worth factors, operating costs, depreciation and (    ).
查看答案
单选题 standard of purchased material: 查看答案
单选题 the "control points" in the work breakdown structure used for isolated assignments to work centers are referred to as: 查看答案
单选题 the utility of network-based schedules: 查看答案
单选题 the way a project manager sends and receives information depends upon: 查看答案
单选题 uncertainty refers to a situation where: 查看答案
单选题 which of the following is closet to deming's definition of quality: 查看答案
单选题 it is useful to conduct project risk assessment according to the project's 查看答案
单选题 management decision-making includes: 查看答案
单选题 the basic terminology for networks includes: 查看答案
单选题 the project manager must receive reports and briefings from engineers, contracting officers, procurement personnel and marketing people.
the project manager's communication dilemma is one of:
查看答案
单选题 the technique most commonly used to determine the profitability of a project includes (    ) methods. 查看答案
单选题 which of the following are part of the purchasing cycle: 查看答案
单选题 which of the following is closest to juran's definition of quality: 查看答案
单选题 a project element which lies between two events is called: 查看答案
单选题 employee unions would most likely satisfy which level in maslow's hierarchy of needs? 查看答案
单选题 management calls a meeting to explain to all employees the new benefits package for the rank and file. this is an example of: 查看答案
单选题 project management/project planning is most closely aligned with: 查看答案
单选题 the profitability and technical data studies are provided in report format to owners and funders for acceptance. this type of report, used to solicit funding, is referred to as a(n) (    ). 查看答案
单选题 which of the following constitute juran's "quality trilogy": 查看答案
单选题 which of the following is most closely associated with business risk: 查看答案
单选题 which of the following types of contracts is equivalent to a cost plus contract: 查看答案
单选题 a project manager recently rewarded an individual with a promotion that carried with it a very small salary increase but substantially more
responsibility. the project manager appears to be appealing to the employee's (    ) need.
查看答案
单选题 most project (and non-project) managers prefer (    ) communications. 查看答案
单选题 on a precedence diagram, the arrow between two boxes is called: 查看答案
单选题 quality control charts show a characteristic of the product or service against: 查看答案
单选题 the identification, definition, and selection of the project objectives as well as the best approach to achieving the project objectives are
indentified in the (    ) phase of the project but first documented in the project (    ).
查看答案
单选题 the work breakdown structure, the work packages, and the company's accounting system are tied together through the: 查看答案
单选题 which of the following is an element of procurement management: 查看答案
单选题 which of the following is most closely associated with pure risk: 查看答案
单选题 assignable cause or special variation is: 查看答案
单选题 in the arrow diagramming method (adm), (    ) do not consume time or resources. 查看答案
单选题 management reserve is generally intended to be used to: 查看答案
单选题 project management has been proven to be successful because employees get to see the entire effort, from beginning to end, rather than just
small pieces. this could be considered an example of:
查看答案
单选题 project managers that are available to answer questions, provide guidance when need, and generally do not interfere with day-to-day activities
have a(n) (    ) managerial style.
查看答案
单选题 the scope baseline once established and approved, is used: 查看答案
单选题 the three most common types of project cost estimates are: 查看答案
单选题 to calculate the expected value of an outcome: 查看答案
单选题 activities with zero time duration are referred to as: 查看答案
单选题 for a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". the total standard deviation for this
characteristic is:
查看答案
单选题 project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in: 查看答案
单选题 selective perception is (    ) of new conflicting information that may result, in a breakdown in communication. 查看答案
单选题 the work breakdown structure (wbs) is an excellent tool for objective control and evaluation. which of the following is generally not
validated through the wbs?
查看答案
单选题 when working in an environment that uses learning curves, the most effective plan for creating the perception that pay is related to
performance is to provide the team members with an individual salary plus bonus based upon
查看答案
单选题 which of the following is not part of the acquisition process: 查看答案
单选题 an individual who is working on the satisfaction of physiological needs has essentially satisfied which needs? 查看答案
单选题 in the pdm, common constraints include: 查看答案
单选题 scope reporting is the timely determination, (    ), and (    ) of project progress, status data, and transforming this into structured
documentation (reports) necessary to judge project performance (reporting on work packages).
查看答案
单选题 there are two major types of reserves used on projects. the (    ) is for (usually major) scope changes that were not considered as part of
the original plan, whereas the (    ) is to compensate for minor changes in estimating, escalation factors.
查看答案