【单选题】

on a precedence diagram, the arrow between two boxes is called:
  • A.an activity.

  • B.a constraint.

  • C.an event.

  • D.the critical path.

  • E.none of above.

参考答案

查看答案

相关试题

单选题 the basic terminology for networks includes: 查看答案
单选题 the work breakdown structure (wbs) is an excellent tool for objective control and evaluation. which of the following is generally not
validated through the wbs?
查看答案
单选题 which of the following is most closely associated with pure risk: 查看答案
单选题 management calls a meeting to explain to all employees the new benefits package for the rank and file. this is an example of: 查看答案
单选题 which of the following is an element of procurement management: 查看答案
单选题 assignable cause or special variation is: 查看答案
单选题 management reserve is generally intended to be used to: 查看答案
单选题 which of the following is most closely associated with business risk: 查看答案
单选题 management decision-making includes: 查看答案
单选题 project managers that are available to answer questions, provide guidance when need, and generally do not interfere with day-to-day activities
have a(n) (    ) managerial style.
查看答案
单选题 most project (and non-project) managers prefer (    ) communications. 查看答案
单选题 in the arrow diagramming method (adm), (    ) do not consume time or resources. 查看答案
单选题 the three most common types of project cost estimates are: 查看答案
单选题 for a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". the total standard deviation for this
characteristic is:
查看答案
单选题 employee unions would most likely satisfy which level in maslow's hierarchy of needs? 查看答案
单选题 which of the following are part of the purchasing cycle: 查看答案
单选题 the technique most commonly used to determine the profitability of a project includes (    ) methods. 查看答案
单选题 the identification, definition, and selection of the project objectives as well as the best approach to achieving the project objectives are
indentified in the (    ) phase of the project but first documented in the project (    ).
查看答案
单选题 scope reporting is the timely determination, (    ), and (    ) of project progress, status data, and transforming this into structured
documentation (reports) necessary to judge project performance (reporting on work packages).
查看答案
单选题 the project manager must receive reports and briefings from engineers, contracting officers, procurement personnel and marketing people.
the project manager's communication dilemma is one of:
查看答案