【单选题】

which of the following utility functions reflects risk-aversion:
  • A.uniform

  • B.increasing

  • C.decreasing

  • D.exponential

  • E.b and d only

参考答案

查看答案

相关试题

单选题 the most precise or accurate estimate for determining project costs is the (    ) estimate. 查看答案
单选题 risk management methodology should be adhered to in: 查看答案
单选题 which of the following activities can be considered as part of risk mitigation 查看答案
单选题 for communication to occur, there must be: 查看答案
单选题 a deficiency in characteristics that render the quality of the material/service unacceptable is usually referred to as: 查看答案
单选题 which of the following networking methods allows us to show that the last 10% of one element cannot be completed until 62% of a previous
element has been completed?
查看答案
单选题 when subordinates know pertinent information that is not known by the project manager, the result is: 查看答案
单选题 there are two major types of reserves used on projects. the (    ) is for (usually major) scope changes that were not considered as part of
the original plan, whereas the (    ) is to compensate for minor changes in estimating, escalation factors.
查看答案
单选题 the most difficult decision for the executive sponsors to make at the end-of-phase review meeting is: 查看答案
单选题 two sources of variation in the length of hex bolts exist. production variation and measurement error. the qc manager knows that the
standard deviation from these sources is 0.24" and 0.43" , respectively. what is the total standard deviation.
查看答案
单选题 which of the following is not part of contract administration 查看答案
单选题 the most expensive phase of life cycle costing is: 查看答案
单选题 the most common form of written project communication is 查看答案
单选题 smoothing out resource requirements from period to period is called resource (    ). 查看答案
单选题 herzberg identified factors which, if present, will lead to increased motivation. a typical factor would be: 查看答案
单选题 which of the following is not an input to quality planning? 查看答案
单选题 the comprehensive review of a contractor's technical performance, cost performance, and delivery schedule, is referred to as: 查看答案
单选题 a line manager possesses information which the project team needs, but withholds the information. the results in a(n): 查看答案
单选题 expectancy theory as applied to project management implies that: 查看答案
单选题 a (    ) estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%). 查看答案