题库 题库

【判断题】

During the period of time charter, the charterer is liable for cost directly connected with the use of the ship, such as bunker costs, crew wages and provisions. (    )

    参考答案

    查看答案

    相关试题

    单选题   查看答案
    单选题 the scope of freight forwarder’s service on behalf of the consignor normally does not include (    ) when the consignor has made a sales contract with the buyer under the FOB terms 查看答案
    单选题   查看答案
    判断题 When the L/C simply stipulates an expiry date without a shipment date, which means these two dates are the same. (    ) 查看答案
    单选题 (    ) is a lump sum rate for the carriage of a container loaded with a particular commodity in marine container transportation. 查看答案
    单选题 According to INCOTERMS 2000,(    )means that the seller delivers when the goods pass the ship’s rail at the named port of shipments. 查看答案
    单选题   查看答案
    单选题   查看答案
    判断题 During the period of time charter, the charterer is liable for cost directly connected with the use of the ship, such as bunker costs, crew wages and provisions. (    ) 查看答案
    多选题 In marine time chartering business, the charterer is responsible for costs such as (    ). 查看答案
    单选题 When the charterer uses more time than time stipulated in a voyage C/P to load his cargo, the ship- owner is entitled to (    ). 查看答案
    单选题   查看答案
    单选题 There are some risks in multilateral trade. They mainly include economic risk and political risks. Economic risk do not include the risk of (    ). 查看答案
    多选题 Institute Cargo Clause B covers loss of or damage to cargo caused by(    ). 查看答案
    单选题 The sea waybill is one of the documents in cargo transport and it serves as (    ). 查看答案
    判断题 BAF,CAF and port congestion surcharges are normally levied by the port authorities in marine container transportation. (    ) 查看答案
    多选题 When the freight forwarder provides services on behalf of the exporter, he would study the provisions of the L/C and all Government regulations applicable to the shipment of goods in the (    ). 查看答案
    单选题 According to UCP600, bill of lading may now allow (    ) provided that the entire carriage is covered by one and the same bill of lading. 查看答案
    判断题 According to Incoterms 2000, CFR means that the risk of loss of or damage to the goods is transferred from the seller to the buyer when the goods pass the ship’s rail at the named port of destination. (    ) 查看答案
    多选题 An applicant is the party who applies to the bank for opening a letter of credit. It usually refers to the (    ) in the sales contract. 查看答案